Projects, Slots, WEP & SOW
Projects represent contract vehicles or task orders. Each project contains slots (individual roles), an optional Statement of Work (SOW), and a Work Environment Profile (WEP) that drives culture-fit scoring. The flow is: project → slot → match → engagement.
Browse your projects
Goal: find and filter your projects.
- Open /company/projects. Use the Active, Drafts, Completed, and Archived tabs, or search by name.
- Each card shows the project name, budget, slots filled (X / Y), a status badge, and a visibility badge — Private, Federated, or Marketplace. Click a card to open it.
- Click Create Project to start a new one.
/company/projectsCreate a project
Goal: stand up a project with roles, SOW, and culture profile.
Open /company/projects/new. The five-step wizard saves your work as a draft as you go:
- Basics — Project name, description, location, work mode, budget (with a "Show to applicants" toggle), visibility, and start/end dates.
- Statement of Work (SOW) — Upload a PDF/DOCX/TXT for AI extraction, or enter objectives and milestones manually.
- Roles — Add one or more role/slot cards (see Slots below).
- Work Environment Profile (WEP) — Answer the culture questionnaire, then set work mode, travel, clearance, and schedule constraints.
- Review & Launch — Review everything and launch.
/company/projects/newVisibility options: Private (your team only), Federated (network partners), or Marketplace (discoverable by any company on Illumera).
| Project status | Meaning |
|---|---|
| Draft | Private; only visible to your admins. Not in the marketplace. |
| Published (active) | Open for matching; unfilled slots appear in the marketplace. |
| Paused | Temporarily on hold; slots hidden from searches. |
| Completed | Work finished; read-only. |
| Archived | Permanently closed; removed from active views. |
Manage a project
Goal: track readiness and act on a project.
Open a project at /company/projects/:id. Key areas:
- The header shows status and visibility badges; use Edit, Add Slot, and the status dropdown.
- The KPI strip shows budget (click for the Cost Scenario), location, timeline, slots filled, and skills addressed.
- The Project Readiness band reports Ready / Mostly Ready / At Risk / Blocked with a progress bar, stale-match warnings, and recommended actions.
- The Slots strip lists each slot card with priority, status, matched count, and a View candidates link. Reorder with the up/down arrows, edit with the pencil.
- Lower sections show the Statement of Work, Work Environment Profile (radar + four CVF bars + hard constraints), Skills Coverage (green = full, yellow = partial, red = gap), and Status History.
/company/projects/:idTo change core details, open /company/projects/:id/edit — name, description, status, marketplace visibility, address, monthly budget (with "Show to applicants"), dates, and (if enabled) job site publishing. Click Save changes.
Define slots
Goal: specify a staffing requirement that drives a matching run. A slot is a single role.
- From the project, click Add Slot (or open /company/projects/:id/slots/new). To edit, open /company/projects/:id/slots/:slotId/edit.
- Set the Role title, description, Required skills, Preferred certifications, Minimum seniority, Hours per week (1–80), Duration weeks, Target rate, and Max rate.
- Optionally set Work Style Requirements — preferred team size (Solo / Small / Medium / Large) and collaboration style (Independent / Collaborative / Mixed).
- In edit mode, set the slot Status — Open, Filled, or Cancelled — and, if your job site is enabled and the project is published, configure Publish to job site fields (employment type, remote type, public description, salary range, deadline).
- Click Create slot (or Save changes).
Required Skills drive Skill Match (weighted by each person's self-rated proficiency). Hours Per Week feeds Availability. Target / Max Rate drive Cost Efficiency — scores peak at or below target and degrade toward the ceiling. The WEP drives the culture dimensions.
Work Environment Profile (WEP)
Goal: set or retake the culture profile that scores candidates for this project.
- Open /company/projects/:id/wep.
- Answer the culture questions one at a time (use Previous or Skip); the progress bar tracks completion.
- On the constraints step, set work mode, travel, clearance required, and schedule (all optional).
- Click Save WEP (or Update WEP when retaking). Culture-fit scoring updates for all open slots on the project.
/company/projects/:id/wepStatement of Work (SOW)
Goal: capture project objectives and milestones, with AI assistance.
- Open /company/projects/:id/sow.
- Drop a PDF, DOCX, or TXT into the upload zone — AI extracts objectives and milestones. Or click Add objectives manually.
- Edit objectives and milestone cards (title, due date, description) as needed.
- Click Save SOW. Objectives flow into the project's Skills Coverage requirements.
/company/projects/:id/sowOnce a slot is configured, find candidates in the Talent Marketplace, then shortlist or invite to create an engagement.